Permits & Fees

Fees - Updated 12/14/18


Encroachment


  • Utility Structure - $553 each
  • Street Cut - $414 for the first 50' and one day of inspection; $67 each additional 50' or portion thereof; $67 each additional inspection day
  • Driveway / Sidewalk - $269 per driveway or 30 linear feet or portion thereof sidewalk
  • Curb Core - $139 each
  • Traffic Control - $346 first day, $88 each additional day
  • Traffic Control (Complex Project) - $5,000 required deposit/fee is actual cost
  • Public Right of Way - $259 each
  • USA Marking Removal - $130 per location on public property

Transportation


  • Single Trip - $16 each
  • Annual Permit - $90 each

Well


  • Utility Structure - $250 for the first well; $125 each additional well
  • Probe Surveys - $250 (unlimited)
  • Abandonment - $100 for the first well; $50 each additional well at the same location
  • USA Marking Removal - $130 per location on public property

Construction Hydrant 


  • Hydrant Water Meter Installation Fee - $250 each
  • Water Usage Deposit - $500 minimum
  • Hydrant Water Meter Relocation - $95 each

Newspaper Rack

Annual Encroachment Permit Required  
  • First News Rack - $243
  • Each Additional News Rack - $88

Parkway Tree Removal / Replacement


  • Matching Parkway Tree Planting Program (no existing tree) - $35
  • Tree Removal / Replacement Permit (homeowner removal) - $576
  • New Tree Installation Service - $425
  • Tree Removal and Replacement (plus cost of tree)
    • Less / Equal to 6" diameter - $661
    • Greater than 6" and up to 12" diameter - $704
    • Greater than 12" and up to 24" diameter - $833
    • Greater than 24" and up to 35" diameter - $997
    • Greater than 36" diameter - $1,094

Permits