Permits & Fees

Fees


Encroachment


  • Utility Structure - $535 each
  • Street Cut - $400 for the first 50' and one day of inspection; $65 each additional 50'; $65 each additional inspection day
  • Driveway / Sidewalk - $260 per driveway or 30 linear feet of sidewalk
  • Curb Core - $135 each
  • Traffic Control Only - $335 first day, $85 each additional day
  • USA Marking Removal - $130 per location on public property
  • Public Right of Way - $250 each

Transportation


  • Single Trip - $16
  • Annual Permit - $90

Well


  • Utility Structure - $250 for the first well; $125 each additional well
  • Probe Surveys - $250
  • Abandonment - $100 for the first well; $50 each additional well at the same location
  • USA Marking Removal - $130 per location on public property

Construction Hydrant 


  • Hydrant Water Meter Installation Fee - $250
  • Water Usage Deposit - $500 minimum
  • Hydrant Water Meter Relocation - $95

Newspaper Rack

Annual Encroachment Permit Required  
  • First News Rack - $235
  • Each Additional News Rack - $85

Parkway Tree Removal / Replacement


  • Matching Parkway Tree Planting Program (no existing tree) - $35
  • Tree Removal / Replacement Permit (homeowner removal) - $468
  • New Tree Installation Service - $353
  • Tree Removal and Replacement (plus cost of tree)
    • Less / Equal to 6" diameter - $554
    • Greater than 6" and up to 12" diameter - $596
    • Greater than 12" and up to 24" diameter - $725
    • Greater than 24" and up to 35" diameter - $890
    • Greater than 36" diameter - $986